Digital Library Programs Strategic Planning Workgroup
This month LITS staff began weekly meetings with the Digital Library Programs Workgroup of the Strategic Planning Initiative. Notes for these meetings are available:
http://staffweb.library.vanderbilt.edu/strategicplan/diglib/home.htm
|
Participation in Planning for OAK (Blackboard) Campus Course Management Software continues:
In January, LITS staff members began meeting with the CMS Support Team on a weekly basis to help develop a list of support and training needs for the initial deployment of the new software. This month the support group has identified tasks and broken into subgroups to address specific areas. LITS staff are working with the Documentation and the Support Hierarchy subgroups.
|
Progress toward Implementation of SFX Service
Ex Libris installed the sfx software on our sfx server earlier this month. Several LITS staff attended training for the SFX service from Ex Libris. Others attended the opening session of the training.
|
ACORN Security Breach
On February 11, LITS staff discovered a toolkit on the Acorn production server (Acorn4) that indicated a security breach of the operating system. Analysis of the kit by both ITS and LITS staff indicated that a remote intruder had plans to launch attacks against other hosts on the internet at some future time from the Acorn4 server. In order to deal with this event, we took Acorn4 offline and brought our backup server (Acorn3) online in a read-only mode, as a precaution. We quickly decided that the safest course of action was to rebuild the root file system on Acorn4. As a result, Acorn was restricted to read only operations for approximately 21 hours. We worked with circulation staff in the divisions to offer an automated alternative to capturing circulation data and were able to use the data the next day to run transactions for Peabody and Central. We are pleased to report that no data was lost due to this event. We regret the interruption to normal operations for patrons and staff.
|
More Servers added to TVNA Server Farm
We installed four new Dell PowerEdge 2650 servers to the existing server farm used by the TVNews Archive project this month. This brings the total number of servers for this project to 10, so far.
|
ILLiad Server Upgraded, Prepared for Web Doc Delivery
Early this month, LITS
upgraded the ILLiad system software to version 6.3.2.3. The upgrade process went well
and the system was back online by 7:30am. Once the upgrade was complete, preparations were completed web
delivery. This service is now ready to implement. We are working
with the Biomedical, Law, and Central libraries to put this service into production. We also configured the new Z39.50 search feature
from ILLiad to Acorn which will reduce time required
to locate call numbers for requested items.
|
Workstation Replacements Continue
In late January and February, we installed new workstations at the Music and Science and Engineering Libraries. Unfortunately, the project was interrupted by the need to install OS patches to all public workstations and to deal with several outbreaks of malware. By the end of Februrary, we have installed 5 (of 6) new workstations at Science and Engineering Library and 5 new workstations at the Music Library.
|
Redesigned STAFFWEB Page Released
In coordination with the staffweb committee, the new staffweb pages were released this month. The URL for the staffweb has not changed:
http://staffweb.library.vanderbilt.edu |
DSpace
LITS staff met with the DSpace Faculty Advisory Committee this month. We have also instituted weekly update meetings with the DSpace project team (Jody Combs, Catherine Gick, and Roberta Winjum). This month we discussed the merits of manually processing local copies of the Economics Working papers to develop appropriate workflows and identify lacunae in existing metadata.
|
Server patches and updates
We installed several security related patches to our Windows 2000/2003 servers this month. We also installed service pack 7 and eDirectory update to all of our Novell servers.
|
Plan to Reindex Acorn
LITS staff finalized plans and communications for the Acorn reindexing project. The project is planned for the first weekend in Spring Break (March 5-March 8). Our procedure will involve rolling over to the Acorn backup server (Acorn3) in limited production mode while reindexing the production server. This will minimize down-time for our patrons and staff. |